Things haven't slowed down much here at the DW2DT compound. It was a good day again today with a few essentials settling into place:
|
Front Door: The front door finally arrived, though this is not it. They installed the new one and surrounding siding then swapped the old one back in to preserve the new one - which is also blue. |
|
Downstairs Bath: New Potty is roughed in, Norah tried it out! |
|
Back Deck Extension: Norah and Roddie inspecting and approve,,, 2nd slider to be added soon! You can't see it, but there are lots of power outlets and outdoor lights roughed in in this area also |
|
Tubbies! TWO! The tubs are back to back in the two bathrooms upstairs. The plumber apparently was in today and started getting a little more detailed with the tub install. |
We also had the electrical inspection today and plumbing inspection tomorrow. Insulation comes next and then the drywall begins in a week or so! Whooheeee!